loaderimg
What
image
  • imageAlcoholic Beverages
  • imageApparel
  • imageApps
  • imageAttendee GHG App
  • imageAttendee Recharging
  • imageAudio Visual
  • imageBanners and Flags
  • imageBar Operators
  • imageBattery Systems
  • imageBinfrastructure
  • imageBooks
  • imageBranding Repurposing
  • imageBuilding Certifications
  • imageBulk Water Supplies
  • imageCampaigns
  • imageCatering
  • Cleaning
  • imageCleaning Supplies
  • imageCoffee Cup Recycling
  • imageCompost Toilets
  • imageComposting
  • imageConferences
  • imageCooking Oil Recovery
  • imageCreative Hire
  • imageCycling and Bike Parking
  • imageDecor
  • Dehydrator - Food Waste
  • imageDishwashing - Mobile
  • imageDisposable F&B Serviceware
  • imageDust Suppression
  • imagee-waste
  • e-Water Cleaning
  • imageEco-Edutainment
  • Eco-Label
  • imageElectric Site Transport
  • imageEnergy Efficiency
  • imageEnergy Floors
  • imageEvent GHG Tool
  • imageEvent Producers
  • imageEvent Standards, Certifications, Benchmarks
  • imageEvent Supplies
  • imageEvent Sustainability Organisations
  • imageEvent Waste Contractors
  • Exhibition Company
  • imageExhibition Displays
  • Exhibition Hire
  • Flooring
  • Food & Bev GHG Measurement
  • imageFood & Beverage
  • Food Items
  • imageFood Recovery
  • Food Trucks and Vendors
  • imageFuel & Fuel Systems
  • imageFurniture
  • imageGarden Games
  • imageGHG EF Databases
  • imageGHG Measurement
  • imageHardboard
  • imageHealth & Safety
  • imageHotel Certification
  • imageHybrid
  • Hydrogen Fuel Cell
  • Inclusion/Accessibility
  • imageKinetic Energy
  • imageLanyards
  • imageLighting
  • imageLogistics
  • imageLook, Overlay, Signage
  • imageMarquees
  • imageMedical
  • imageMerch & Gifts
  • imageMobile Bar
  • imageMobile Generators
  • imageMobile Solar
  • imageMobility Planning
  • Navigation
  • imageNon-Alcoholic Beverage
  • imageOnsite Traders
  • imagePaint
  • imagePaper
  • imagePaperboard
  • imagePedal Power
  • imagePersonal Protective Equipment
  • Plant-Based
  • Plants & Flowers
  • Portable Buildings
  • imagePower
  • imagePower Efficiency Consultants
  • imagePrinted Floor
  • imagePrinted Wall Coverings
  • imagePrinting
  • imageProduction House
  • imagePyrotechnics
  • imageRecycling Services
  • imageRefrigeration
  • Reusable Bowls
  • imageReusable Cups
  • imageReusable F&B Serviceware
  • imageReusable Plates
  • Saas Platform
  • Saas Platform
  • imageSalvage
  • imageSecurity
  • imageSelf Adhesive
  • Sensory Inclusion Training
  • Sensory Kits
  • Sensory Rooms
  • imageSignage
  • imageSite Lighting
  • imageSite Transport
  • Social Waste Programmes
  • imageSoft Plastics Recycling
  • imageSound Systems
  • imageStandards, Certifications, Benchmarks
  • imageStructures & Stages
  • imageSupplier Databases
  • imageSustainability Consultants
  • imageSustainable Event Tools
  • Takeout Containers
  • imageTechnology
  • imageTents & Campsite Services
  • imageTextiles
  • imageTicketing & Accreditation
  • imageTimber
  • imageToilets
  • imageTraffic Management
  • imageTransport
  • imageUrinals
  • imageVacuum Flush
  • imageVenue Certifications
  • imageVirtual
  • imageVirtual Gift Bag
  • imageWaste & Resource Recovery
  • Wastewater Treatment
  • Water Filtration
  • imageWater Generator
  • imageWater Refill
  • imageWater Treatment
  • imageWind
Where
image
image

SPECS OF THE STAGE:

  • Height = 21 meters
  • Base diameter = 10 meters + 6 x 8 meters stage area
  • Wind turbine = Darrieus-Savonius Vertical Axis, 3kW
  • Battery = 25 VRLA cells, 30 kVA, 90kWh
  • PV panels = Semi Flexible, PERC cells, 10 kW

DID YOU KNOW:

  • More than 3.500 kg of steel has been used to build the GEM-Stage
  • There are over 300 hinges placed in the tower
  • 542 bolts and nuts are required
  • The height of the triangles becomes 14 times bigger after folding out the tower (from 96 centimeters to aprox. 14 meters)
  • The 700 kg vertical wind turbine is places at a height of 18 meters
  • Nearly 20m² of colored solar panels (LSC panels) are incorporated in the tower
  • The stage does not have to be anchored
  • 2.7 m³ of concrete was used as a counterweight
  • 10 companies from 3 different European countries are involved in this project
  • An estimated 100 people contributed to the realization of the first GEM-Stage
  • The 90 kWh GEM-Stage battery can charge one iPhone up to 6000 times – that’s 16 years of charging your phone daily
  • In summer, the GEM solar system can charge a Tesla Model 3 up to 30%

GEM-Tower has officially become GEM-Stage! 
From now on, artists will be able to play on a stage that produces 100% of its own green energy. 

Rate us and Write a Review

Your Rating for this listing

angry
crying
sleeping
smily
cool
Browse

Your review is recommended to be at least 140 characters long

image

building Own or work here? Claim Now! Claim Now!
image